Step Energy delivered a high-performance Solar PV system at Greenstone Primary School, supporting the school’s sustainability ambitions and low-carbon operational goals.

The installation forms part of the school’s wider low-carbon design strategy, contributing directly to operational carbon reduction:

  • Installed DC Power: 14.65 kWp
  • Annual Solar Energy Production: 13,070 kWh
  • CO₂ Saved Per Year: 2.53 tonnes (equivalent to planting 116 trees annually)
  • Solar Modules: 34
  • Performance Ratio: 90%

The PV system provides long-term benefits, cutting emissions, lowering energy costs, and supporting climate-conscious learning environments.

Sustainability & Impact

The school’s broader design integrates sustainability at every stage. Step Energy’s PV installation complements these measures by:

  • Reducing operational carbon for the school building
  • Supporting whole-life carbon reduction initiatives
  • Contributing to the school’s EPC A rating
  • Contributing to the school’s annual energy requirements through clean, renewable power
Harworth Group Coalville 023 low res
Harworth Group Coalville 032 low res scaled

School Context

Greenstone Primary School is part of Harworth Group’s sustainable South East Coalville development, which introduces over 2,000 new homes, retail facilities, and community spaces.

PICS011 BW 141042
PICS011 BW 141119 2048x1365

The school is Leicestershire’s first purpose-built forest school, designed around forest school principles:

  • Six pavilions providing teaching, Early Years, administration, and communal spaces
  • Outdoor classrooms and planters to enhance biodiversity and hands-on learning
  • Flexible spaces that integrate indoor and outdoor teaching

The PV system sits atop a sustainably constructed building, supporting the school’s low-carbon operational targets and its position as a model for environmentally responsible education in the area.

PICS011 BW 141115
PICS011 BW 141130
All Projects